Springfield Commercial Centre.


We’re pleased to have been appointed by Gaunts Ltd as Principal Contractor for the 8 new industrial units at Springfield Commercial Centre — a key site with real heritage in the heart of West Yorkshire.

This project will deliver eight new hybrid business units, designed to support the evolving needs of local SMEs.

Phase 1 – External Works & Parking

Now complete, Phase 1 included a full reconfiguration of the car park, with the creation of a new tiered system to increase capacity. Works also included extensive retaining wall construction and service infrastructure upgrades to prepare the site for the next phase.

Phase 2 – Hybrid Unit Construction

Phase 2 is now underway and includes the construction of eight high-spec units — combining ground-floor workshops with first-floor offices and dedicated parking. Groundworks and drainage are nearing completion, with steelwork due to be erected later this month.

Target completion: December 2025

A big thank you to the team delivering this scheme for Gaunts Ltd:
Bowman Riley – Architects, Building Consultants, Interiors
Shelby Group – Quantity Surveyor & Project Manager
CCS Consulting – Structural Engineers
Delta Construction Consultants – Building Control
OGL Construction Site Manager – Ryan Borton

We look forward to sharing our continued progress.

In the meantime please check out these press releases.
West Leeds Dispatch
Keighley News

We’d love to hear from you.

Required
Required
Required
Required
Share this post: Tweet Share Share Pin it

We’d love to
hear from you.

Required
Required
Required
Required