Yorkshire Coastliner Limited, Rawcliffe
Civil Engineering Division Phase 1 Infrastructure Upgrades
Client: Transdev Blazefield Ltd
Transdev required a new purpose-built depot to run, maintain and park their fleet of 27 buses. The scheme which commenced in September 2022, includes the demolition of existing buildings, the supply and installation of new infrastructure including surface and foul water drainage, power, water and gas, the construction of new external yards and a purpose built 3 bay bus garage with adjoining workshops, offices and welfare facilities for the drivers.