Yorkshire Coastliner Limited, Rawcliffe

Civil Engineering Division Phase 1 Infrastructure Upgrades


Client: Transdev Blazefield Ltd

Transdev required a new purpose-built depot to run, maintain and park their fleet of 27 buses. The scheme which commenced in September 2022, includes the demolition of existing buildings, the supply and installation of new infrastructure including surface and foul water drainage, power, water and gas, the construction of new external yards and a purpose built 3 bay bus garage with adjoining workshops, offices and welfare facilities for the drivers.

We’d love to hear from you.

Required
Required
Required
Required

We’d love to
hear from you.

Required
Required
Required
Required