Red Brick Retail Park, Batley.


Client: Redbrick Mills Ltd

A 12,000 sqft warehouse was our second scheme for furniture specialist Redbrick Mills Ltd. This project involved a steel portal frame and Kingspan KS1000 composite cladding. To work within the schemes budget the external yard area was constructed using a Type 3 MOT allowing surface water to pass through the stone and into perforated pipes. This was apposed to more traditional methods such as macadam or concrete

We’d love to hear from you.

Required
Required
Required
Required

We’d love to
hear from you.

Required
Required
Required
Required