Red Brick Mill
An unused section of commercial space was left vacant at Redbrick Mill, Batley. The space was tired-looking and used as a storage area. The Client required a facelift to attract new potential tenants. Working alongside an experienced design team, OGL were instructed to do just that.
The external alterations were significant. They included a replacement roof, new façade, underpinning and numerous structural alterations. The internal alterations were completed in February 2023, allowing Loaf to take possession of the newly refurbished building.